Brickfields Athletics Track, Plymouth

The 400m track at Brickfields was totally re-laid and the long jump, high jump, shot put, throwing cage and water jump were refurbished to provide competition standard polymeric facilities. The works included base construction on the track to correct the surface levels and the surrounding edgings were reformed to meet competition standards.

  • Removal of previous surface
  • Drainage installed

Project – Reconstruction and surface of Athletics Track

Client – Plymouth City Council

Value – £580,000

Period – 2020

We would like to thank Smith Construction and Plymouth City Council for the refurbishment of the Brickfields track and field facility. It is now a really high quality arena that everyone can use, come rain or shine. We hope that local organisations, schools and other community groups will utilise these facilities going forward.